Piloti

Not verified. Claim this page

Sustainability Summary

  • This is an unclaimed profile. Piloti has not joined Sustainability Tracker to verify their sustainability credentials. We gathered what we could from public sources.
Powered by Tracker AI BETA; there may be errors

Piloti Sustainability Profile

Piloti is not currently tracking sustainability.

Sustainability Summary

  • This is an unclaimed profile. Piloti has not joined Sustainability Tracker to verify their sustainability credentials. We gathered what we could from public sources.
Powered by Tracker AI BETA; there may be errors
Piloti’s sustainability-related content is limited in the provided source material. The material mainly describes ArcelorMittal’s renewable energy and decarbonisation initiatives, including a wind farm and a planned solar project, as well as VEM Sistemi’s ESG policy, reporting, energy efficiency measures, employee training, supplier standards, and inclusion initiatives. No clear sustainability information specific to Piloti is provided beyond these references.

Piloti Sustainability Actions

Wind farm put into operation

ArcelorMittal and Casa dos Ventos have put 100% of the Babilônia Centro Complex into commercial operation in Várzea Nova, in the north-central region of Bahia. The wind farm was completed ahead of schedule in July, with 123 wind turbines and fully connected to the National Interconnected System, with full commercial operation authorized in October.

Low-carbon steel used

For the construction of the complex, ArcelorMittal supplied XCarb© rebar, a low-carbon steel. The product, used in the foundation of the wind turbines, is produced with 100% recycled metal and 100% renewable energy, which reduces carbon emissions in the production process by approximately 60%.

Sustainability report published

VEM chose to prepare its first Sustainability Report in advance of its regulatory obligations. The company says the report marks the official start of a journey made up of responsibility, respect for people, attention to the environment around it and a vision of the future it would like to build.

Photovoltaic system installed

At its headquarters in Forlì, VEM installed a 149.41 kWp photovoltaic system for the autonomous production of renewable energy. This intervention is complemented by an advanced Building Management System (BMS) for monitoring and optimising consumption in real time.

Plastic consumption reduced

To limit the use of disposable plastic, VEM has introduced water dispensers at all locations, phasing out small bottles. Each new VEMmer receives a personalised water bottle for daily use. This choice has led to a reduction in per capita plastic consumption.

See All (6)

Piloti Sustainability Commitments

2030

100% renewable electricity

ArcelorMittal's decarbonization strategy aims to achieve 100% renewable electricity by 2030.

2050

Net-zero carbon emissions

ArcelorMittal's decarbonization strategy aims to achieve net-zero carbon emissions by 2050.

2025

Solar plant operation

Construction of a solar energy project in the Babilônia Centro Complex is in an advanced stage, with commercial operation scheduled for December 2025.


Sustainable Development Goals

Piloti is committed to advancing these Global Goals to promote prosperity for people & planet.

 Logo

 Logo

 Logo

 Logo

 Logo

 Logo

 Logo